Eight Building System Integration Tips Collectively the industry has many “lessons learned”, and by acknowledging and sharing these lessons, the industry benefits. |
|
Articles |
Interviews |
Releases |
New Products |
Reviews |
[an error occurred while processing this directive] |
Editorial |
Events |
Sponsors |
Site Search |
Newsletters |
[an error occurred while processing this directive] |
Archives |
Past Issues |
Home |
Editors |
eDucation |
[an error occurred while processing this directive] |
Training |
Links |
Software |
Subscribe |
[an error occurred while processing this directive] |
Building system
integration has potential benefits for enhanced
functionality and automation as well as more focused and meaningful
information to monitor and manage building performance. The origin of
system integration or interfacing started with fire systems triggering
reactions from other related building systems; HVAC, access control,
elevators, etc. Today system integration includes all of the control
systems in a building, but also encompasses facility management
systems, business systems, and eventually utility grids. Despite where
the industry is now and moving towards, there seems to be precious
little in the way of structured education or training for the
implementation of building system integration (we’re working on
it). So much of what we learn is through the process or
experience of integrating systems: actively being involved in system
integration projects exposes the real life integration issues with
data, clients, the client’s contractors, the BAS network, etc.
Collectively the industry has many “lessons learned”, and by
acknowledging and sharing these lessons, the industry
benefits. What follows are a few experiences, perspectives
and contributions to the effort:
1. Existing Buildings have Baggage – Existing
buildings usually have a lot of pre-existing issues that must be
resolved during the integration project. Many of these issues will
affect a system integration project but are matters unto themselves.
One example would be the lack of a naming convention for building
equipment. The system integrator can’t manage a project where similar
equipment has many different names; that’s a recipe for confusion. But
given that situation the system integration project has to spend time
developing a naming convention, coordinating it with the client and
then translating all the existing equipment names over to the new
naming convention.
A second example would be the BAS network architecture, especially in large existing buildings or campuses. Over time BAS controllers and field devices are replaced or added to the BAS network. Typically the work is completed by a series of different technicians from the local branch office of the manufacturer, and not a lot of thought is given to the network architecture and impact on the throughput on the network. The result over time is the BAS network becomes unbalanced with too much traffic on some trunks, adding complexity for the system integrator to acquire data across the network.
2. Fault detection applications do not come “right out of the box” –
Fault detection is analyzing real time data from an HVAC system against
a set of rules which address relationships of different HVAC equipment.
It has proven to be the “killer app” for buildings. It’s been shown to
save energy and signiciantly improve operations. However, it doesn’t
just come “right out of the box” as if it were a software program you
install on your PC from a thumb drive. Almost every building and HVAC
system is slightly different and you end up having to customize the FDD
rules. Surely you’ll find similar buildings and HVAC systems in some
cases, such as retail stores, but the vast majority of buildings will
need to tweak or customize FDD rules. That’s not necessarily a bad
thing as the customized rules are likely to be more accurate and based
on client needs, but customization requires time, possibly extending
schedules.
3. Applications Without A Plan –
System integration can facilitate applications such as consolidated
alarm management where the alarms from all the building control systems
can be monitored and managed from a single application. If FDD is the
most effective software application, consolidated alarm management may
be in second place. The easiest part of deploying an alarm
management application may be acquiring the alarm data from the
building systems. The more difficult part is having an alarm
management plan underlying the application. The alarm management plan
usually lists the alarms, prioritizes them, details the response for
each alarm, groups various types of alarms, etc. Many building Owners
don’t have an alarm management plan but without it the application goes
nowhere; therefore the contractor for the system integration must work
with the Owner to prepare a comprehensive plan.
4. More Is Better -
There is no such thing as having too much information and documentation
about the building’s sub-systems. By the end of a system integration
project you will have to know every system in detail; the sooner you
get that done the faster the project will be completed. You’ll want
as-built drawings, control drawings, point’s lists, model numbers,
versions, system server locations, etc.
5. Less is More –
One approach to system integration is to implement a platform that
acquires data from every data point for every system. It maximizes the
data available to present to users or to analyze. It would seem to be
the optimal approach. What you find however is you don’t need all
that data; what you really need are just the important data points that
support key performance indicators or specific analytic routines. The
downside to acquiring all the data as opposed to selective data is that
your database becomes bloated with information you’ll never use.
Acquiring that data adds traffic to the network, affecting throughput –
especially the case with older BAS controllers and data acquired from
slow RS485 networks.
6. Early Owner Involvement is Key to Success –
Building Owner/Operator input regarding the user interfaces is critical
and the sooner they get involved the better. The “Building Owner”
will consist of many disparate groups. You need to identify the “user
groups” and spend time on what’s important to them. The initial
implementation meeting should address the tasks and expectations for
the client’s involvement. If you bring the client in too late in the
process you risk alienating them and having them feel the integrated
solution doesn’t address their needs, not to mention adding in
additional cycles of revisions. The project team needs to clearly
layout the revision process at the start and stick to it. If the
Owner/Operator is unable or unwilling to participate, get them involved
by giving them a choice between different versions of user interfaces
instead of asking them to comment and provide direct input.
7. Racing to the Finish Line -
For new construction, integration work tends to happen at the very end
of a project once all building system contractors are finished.
For some projects getting to final completion and starting the handoff
to occupancy and operations can be chaotic. Sticking to a schedule
during this time is a challenge and needs to be a greater consideration
than usual. Clearly establish from the start what tasks by others are
key to starting integration work and what the impact of any delays will
be on the project schedule. Also, equally important is to define what
is required for substantial completion versus final completion so that
everyone’s expectations are the same and the contractor is able to
close out the project in a timely manner.
8. Designing Integration into New Construction –
The design of a new building would seem to be the perfect environment
for integration of building systems; without any baggage that an
existing building may have, the design engineer starts with a clean
slate and can specify exactly what is needed in a formal Division 25
Integrated Automated construction document. However, the idea of
integration automation is driven by the Owner, and without clear
direction designers will simply design their system; the MEP will
integrate fire, HVAC, access control and elevators via a traditional
BMS and that will be the extent of the integration. The further along
the design process gets the more resistance there is to changing the
standard proven automation design.
[an error occurred while processing this directive]The
activity for developing and eventually bidding the integration
requirements is slightly different; it involves much more coordination,
touching on each of the designers or engineers that are specifying
systems, each of the contractors that are installing systems, and many
different client “factions”. Getting these multiple groups to
understand the integration concept and their role and responsibilities
in designing and deploying can be disordered and a challenge.
Also, the construction documents bid out for the integration automation may be laden with software requirements and IT infrastructure, and seem foreign to a construction management (CM) company typically procuring a certain amount of units of specific materials or equipment. A designer may be required to quantify any aspect of the integrated automation (server processor speed, number of dashboards, number of points, etc.) just to satisfy that the construction documents for the automation are “biddable”.
Building systems
integration continues to demonstrate a significant impact on building
life cycle cost, primarily impacting operations and energy consumption.
As the process for implementing integration projects continues to
develop and improve, and as buildings become more complex, Owners and
facility management will more readily adopt the integrated approach.
With that will be a rise in structured education for system integration
as well as enhanced solutions.
For more
information, write us at info@smart-buildings.com.
*Photos
courtesy of Google Images.