University Science Building saves $1.2 million in annual energy costs while maintaining environmental safety ventilation requirements
Articles |
Interviews |
Releases |
New Products |
Reviews |
[an error occurred while processing this directive] |
Editorial |
Events |
Sponsors |
Site Search |
Newsletters |
[an error occurred while processing this directive] |
Archives |
Past Issues |
Home |
Editors |
eDucation |
[an error occurred while processing this directive] |
Training |
Links |
Software |
Subscribe |
[an error occurred while processing this directive] |
This university Science and Engineering Building (SEB)* is a 130,000 square foot state-of-the-art nanotechnology research facility. It houses class-10, class-100, and class-1,000 cleanrooms, offices and classrooms.
* Due to confidentiality agreements, we are not able to provide the client name. We will refer to the building as SEB throughout this case study.
The Challenge
The University has a goal to reduce its greenhouse gas emissions by 30%
below 2006 levels, by employing energy conservation measures in its
buildings across campus.
From its beginnings, SEB was designed with future flexibility in mind. As a result of this flexibility, the building was operating at greater than $35 per square foot for utilities, with significant excess HVAC capacity. The University wanted to reduce energy consumption at SEB while maintaining safety. This is consistent with the overall campus sustainability vision of improving energy efficiency to provide for a healthier environment for students, staff, and surrounding communities.
Cimetrics’ Solution
Cimetrics was selected to provide its Analytika Pro solution for SEB.
Cimetrics collaborated with Siemens, SEB’s building automation system
provider, to connect to and collect sensor and actuator data from
almost 3,500 physical points. Data was collected continuously, 24 hours
a day, and 365 days a year, totaling over 330,000 data samples per day.
The following systems were monitored: 8 air handling units, 18 chilled water and hot water pumps, 4 steam-to-hot-water heat exchangers, 192 terminal units, 25 recirculating air handling units, and 106 fan coil units.
Over 1,000 Analytika software algorithms
continuously analyzed the data to identify opportunities to reduce
energy consumption, improve comfort, and reduce operations and
maintenance costs.
Experienced Cimetrics engineers leveraged Analytika software to
identify opportunities, determine root cause, and calculate annual
savings impact. Actionable recommendations were documented and provided
to the client both through online and offline channels. Cimetrics’ role
did not end with providing recommendations; Cimetrics engineers engaged
with the client team on a regular basis to help answer questions,
coordinate implementation, and provide regular feedback on progress.
Results Achieved
• Financial summary
• Total energy savings: $1.2 million/year (25% of annual cost)
• Operating cost reduction of $9 per square foot
• Simple payback: < 6 months
• Net present value: $4.2 million
• Operational benefits
• Sustainability and environmental stewardship: Achieved 3,200
metric tons in annual CO2 emissions reduction, which is the equivalent
of taking almost 700 cars off the road.
• Vendor management: Verified that optimum sequence of
operations were programmed into the building automation system (BAS) by
outsourced facilities management vendors.
• Utility Incentive: Identified eligible measures under the local utility’s Pay for Performance program.
Example of Fault Detection and Diagnostics: Simultaneous Heating and Cooling
The humidifier steam jacket in a large air handling unit (AHU) had a
significant leak, resulting in excess heating in the air handling unit.
As a result, the cooling coil valve opened to maintain discharge air
temperature and relative humidity.
This fault was not detected on-site
because the AHU was still providing the required humidity and
temperature in the zones. However, the AHU was using a substantial
amount of excess energy as a result of the leak.
Solution
Cimetrics worked with SEB staff and their controls vendor to fix the leak and verify the savings.
Annual energy savings achieved: $59,204
Annual carbon emissions reduction: 114 metric tons
[an error occurred while processing this directive]Example of Optimization:
Air Change per Hour (ACH) Reduction
Zones in SEB were operating at a much higher than necessary air change rate based on the original design.
Implementing a strategy to reduce air changes per hour can have a
significant impact on energy and greenhouse gas savings without
impacting safety.
Solution
Cimetrics worked with SEB facilities personnel and Environmental Health
& Safety personnel to define and implement a strategy to reduce ACH
at the zone level to maximize savings and maintain adequate ventilation
in the spaces.
Annual energy savings achieved: $216,105
Annual carbon emissions reduction: 169 metric tons
For more information visit http://www.cimetrics.com