Cimetrics Case Study: Global Pharmaceutical Manufacturer saves $650,000 in annual energy costs while improving comfort, sustainability and capital asset reliability.
Articles |
Interviews |
Releases |
New Products |
Reviews |
[an error occurred while processing this directive] |
Editorial |
Events |
Sponsors |
Site Search |
Newsletters |
[an error occurred while processing this directive] |
Archives |
Past Issues |
Home |
Editors |
eDucation |
[an error occurred while processing this directive] |
Training |
Links |
Software |
Subscribe |
[an error occurred while processing this directive] |
Overview
This corporation* operates in over 100 countries specializing in the
discovery, development, manufacturing and marketing of medicines in the
areas of Cardiovascular, Gastrointestinal, Infection, Neuroscience,
Oncology and Respiratory & Inflammation diseases. Facing challenges
due to increased competition, drug patent expirations and intensifying
price pressures, this firm needed to focus on innovation while
improving operational efficiency.
*Due to
confidentiality agreements, we are not able to provide the client name.
We will refer to the firm as GPM throughout this case study.
The Challenge
GPM had a goal of reducing energy consumption throughout its global
facilities by 30% by 2015 from 2010 levels. Additionally, GPM had a
global commitment to reduce operational greenhouse gas emissions by
20%. To this end, GPM was interested in implementing energy
conservation measures and technologies, which help achieve these goals
while improving the overall reliability of their operations.
Cimetrics' Solution
Cimetrics was selected to provide its Analytika Pro solution for five
buildings at GPM's campus in the Northeastern United States. The
buildings included 1.5 million square feet of FDA validated and
non-validated space that is utilized for offices, research
laboratories, manufacturing and energy utility generation. Cimetrics
collaborated with GPM and their building automation system provider to
connect to and collect sensor and actuator data from over 4,700
physical points. Data was collected every 15 minutes, 24 hours a day,
365 days a year, for a total of approximately 1.5 million data samples
per day from the following systems: 8 Chillers, 9 Boilers, 5 Cooling
Towers, 25 Air Handling Units, 60 Laboratory Fume Hoods, 206 zones, 20
pumps and motors, and other miscellaneous equipment.
Over 900 Analytika software algorithms then analyzed the data to
identify opportunities to reduce energy, environmental, maintenance,
operations and regulatory costs. Analytika also uncovered
potential equipment problems, opportunities for profitable retrofit
projects, occupant comfort improvement, and operational uptime
improvements.
Experienced Cimetrics engineers leveraged Analytika software to
identify opportunities, determine root cause and calculate annual
impact. Actionable recommendations were documented and provided to the
client both through online and offline channels. Cimetrics' role didn't
end at recommendations. Cimetrics engineers engaged with the client
team on a regular basis to help answer questions, coordinate
implementation and provide regular feedback on progress towards
targeted results. Furthermore, Cimetrics helped secure over $100,000 in
utility incentives to help pay for implementation of recommendations.
This business process helped achieve over 90% implementation of
recommended actions.
Results achieved
• Energy savings financial summary
o Energy savings: $647,233
o Simple payback: 0.33 years
o Net present value: $984,396
• Other operational benefits
o Implementation rate of recommendations: 90%+
o Utility incentives secured: $100,000
o Capital asset reliability. Instituted predictive
maintenance program across all major HVAC systems. Chillers are one
example where equipment life was extended by five years.
o FDA Compliance. Tracked and maintained temperature
and relative humidity control in manufacturing clean rooms.
o Resource management. Utilized impact analysis to
prioritize workload for internal maintenance and contract controls
personnel and maximize progress towards corporate goals.
o Capital project justification. Although the focus
of Analytika is on operational optimization, a relevant heat recovery
capital project was identified, developed and implemented. This project
helped reduce load on the existing central utility plant, which had
been running near capacity.
Example of implemented opportunities
Air handing units (AHUs) were identified to be in operation excessive hours during unoccupied times.
Solution
Cimetrics worked with controls contractor to change the sequence of operation during unoccupied hours.
Solution
Energy savings for solution: $43,412
http://www.cimetrics.com | http://www.analytika.com