Hilton San Diego Bayfront San Diego, CA, United
States of America
Rising 30-stories above San Diego Bay, the Hilton San Diego Bayfront hotel
opened in 2008 as California’s newest waterfront skyscraper hotel. The property,
with its spectacular terrace over the Bay and its sun-drenched interiors,
exemplifies the best of post-modern architecture and state-of-the-art
engineering technologies.
Just minutes from the airport, adjacent to the San Diego Convention centre, the
hotel has 1190 guest rooms, 30 luxury suites and 165,000 square feet of meeting
space. It is unquestionably one of the most comfortable hotel environments on
the West Coast, due in part to its innovative Heating, Ventilation, and Air
Conditioning (HVAC) and Building Automation System (BAS).
Right from the planning stage, the developer placed top priority on energy
efficiency coupled with guest comfort. Moreover, the hotel had to be built for
long-term sustainability with technologies that could be easily and cost
effectively upgraded as needed.
High on the List of Priorities
Since the Hilton San Diego Bayfront project was green field construction, the
building automation system had to meet very stringent and specific criteria.
Distech Controls’ Systems Integrator, Dynalectric San Diego, supplied a complete
spectrum of BAS services, including Distech Controls products based on the
developer’s priorities. Distech Controls was selected on the basis of:
[an error occurred while processing this directive]
An Open System: Best-in-class industry standards based on LONWORKS® technology;
Continuous Source of System Components: Original hardware and software from the
manufacturer had to be consistently available, and later versions had to be
compatible;
Easy Integration and Future Enhancements: BAS had to allow for the seamless
integration of additional components. Furthermore, the system had to provide the
ability to easily leverage future technology improvements.
Read complete case study
here
Highlights:
• New construction project
• Opened in 2008
• High rise hotel with 1190 guest rooms plus 165,000 sq.ft. meeting space.
• A showcase of best-in-class building automation systems
Distech Controls Products:
• LONMARK Certified Programmable and Configurable Controllers.
• EC-Light LONWORKS lighting solution
• EC-Net Web based multi-protocol building automation system
Total number of controllers: 385
Total number of control points: 2854