July & August 2004 |
[an error occurred while processing this directive] |
Articles - August 2004
Our authors provide insight
into our rapidly evolving industry.
Please take the time to read their valuable articles.
Connecting Convergence August Supplement Engineered Systems
Connecting Convergence
Ken Sinclair, AutomatedBuildings.com
Convergence or Divergence Anto Budiardjo,
Clasma Inc.
Overload. There are too many processes running under this userid. Please wait a minute and try again. (fork failed) |
Measuring The Right Thing For Humidity Control… It's the Dew Point Stupid! Mike Schell, AirTest Technologies
Plan Users Guide - Job Planning Planning is not optional, unless profits are optional. Gaining better understanding and management of job costs. Al De Wachter, ICS Inc
Be Cautious when Specifying Multi-Range Pressure Sensors Everyone likes the inventory savings and installation flexibility that result from “one size fits all” pressure sensors. Terry Troyer, HVAC Product Marketing Manager, Setra Systems, Inc.
Indoor Climate Control The European Perspective Simon Fowler, Technical Sales Manager, Madur Electronics, Vienna
Vykon Energy – A Platform for Demand Response Phil Bomrad, Director of Marketing, Tridium
Landscape Sprinklers/Irrigation and Building Automation Should they be integrated? Gaylen Atkinson, President, Atkinson Electronics Inc.
Open Systems Standards This is the fifth of 9 articles where we are introducing the cost benefit for interoperability and that gained from the procurement technique achievable with open systems and choice. This article sets out some of my opinions, a collection of web-based technical data and then a current market summary opinion. Paul D.J. Mason, C.E.O. BWP plc
Building the Building Domain Moving to the next chapter and getting on with the exciting business of building our clients’ real time data domain will have a profound effect. Ken Sinclair, AutomatedBuildings.com
Articles - July 2004
The Final Frontier for Double-Digit Savings High-Tech Contractors can achieve better profitability. Al De Wachter, ICS Inc
A Wake-Up Call and a Brainer Ask any economist worth his salt what the total impact on American industry would be if our gross use of energy were to decrease by 15% over the next 10 years. David E. Craven, Director of OEM Sales, AndoverControls
oBIX Building Blocks Simple modules. Complex modules. Each self contained. Each with a well-defined interface for interoperability. Toby Considine, Technology Officer, Facility Services, University of North Carolina – Chapel Hill, oBIX Chairman
Request for Participation - Summer 2004 - Automated Demand Response Test for Large Facilities Lawrence Berkeley National Laboratory (LBNL) is recruiting energy and facility managers of large facilities to participate in the 2004 Automated Demand Response (Auto-DR) research project. This project builds on the methods used in LBNL’s 2003 Auto-DR tests.
Ventilation Needs and the Requirements in the ICC’s 2003 International Mechanical Code, Analysis, Recent ICC Actions and Recommendations Leonard A. Damiano, V.P. Sales & Marketing, EBTRON, Inc.
Introducing Earthquake Intelligence in Building Automation Earthquakes are not rare events. On a yearly basis, 70 to 75 damaging earthquakes occur throughout the world. Holly Stump, V.P. Marketing, Seismic Warning Systems, Inc.
Variable Frequency Drives Deliver Tremendous Energy Savings...But How Do You Deal With Harmonics? White Paper Siemens Building Technologies, Inc
Hydro Tasmania Uses MatrikonOPC Tunnelling Technology Case Study OPC Tunnelling Technology provides an easy, reliable and effective way to communicate across different network domains and does away with the headaches typically associated with the configuration of DCOM. Joanna Gietz, Press Liaison, Matrikon Inc.
VOIP VOIP or Voice Over Internet Protocol Jack Mc Gowan, CEM, Energy Control Inc.
LonMark International and the LonMark System This is the fourth of 9 articles on VBHQ where we introduce the building, the cost benefit for interoperability and the cost benefit gained from the procurement technique achievable with open systems and choice. Paul D.J. Mason, C.E.O. BWP plc
Yakima County Technology Services Case Study Its remote unmanned data center was designed and constructed to provide state and local agencies with the business continuity and disaster recovery services that they need. Cam Rogers, Sales Channel & Business Development Manager, RLE Technologies
Procurement of the Latest and Greatest The request for proposal approach allows active solicitation of the innovative approach. Ken Sinclair, AutomatedBuildings.com
Past Favorites
Overload. There are too many processes running under this userid. Please wait a minute and try again. (fork failed) July
David E. Craven, Director of OEM Sales, AndoverControls A Wake-Up Call and a Brainer
June
Ken Sinclair, AutomatedBuildings.com Waking Up to Wireless
Paul Sereiko, Founder, President, Sensicast Systems Wireless Mesh Sensor Networks
Al Mouton, President, Loytec Americas Inc. LonWorks and BACnet System Solution on a Chip
May
Al Mouton, President, Loytec Americas Inc. LonWorks and BACnet System Solution on a Chip
April
Paul D.J. Mason, C.E.O. BWP plc Cost Comparison Model - Open vs Proprietary
March
Weilin Wang, Michael Nova, and John Edler, Kiyon, Inc. Autonomic Wireless Building Networks
February
Deepak Wanner, Founder, Precidia Technologies Reaping the Benefits of IP
January 2004
Jason Sprayberry, Digi International Ethernet: The Common Thread to Total Building Systems Integration
December
Randy Kondor, Matrikon Inc. Integrating OPC into Building Automation - The Latest Trend
November
Engineered Systems November Supplement Marketing Convergence
October
Thomas Hartman, P.E. The Hartman Company Ending the Blackout Blues
September
Peter Manolescue, securityXML Ltd. Protocol war yields to productive peace
August
John J. "Jack" Mc Gowan, Energy Control Inc. Internet-based Energy and Security
July
Ken Sinclair, AutomatedBuildings.com XML Spells Connection to the Future
Gary Bark, Plexus Technology Limited Key Criteria for Selecting Building Controls Web Servers
Overload. There are too many processes running under this userid. Please wait a minute and try again. (fork failed)
[Click Banner To Learn More]
[Home Page] [The Automator] [About] [Subscribe ] [Contact Us]